m.亚洲天堂,国产高清视频在线,亚洲 欧美 国产 动漫 综合,精品第一国产综合精品蜜芽

Main page Products certificates About us Contact
 
Products
 
New Products
Roadheaders
Mining equipment
Rock Tunneling
Shielding equipment
Drilling Rig for Coal Mine
Secondary Transport System
Drilling Rig
Truck-mounted Crane
Special Purpose Vehicle
Electric Parts
Hydraulic element
Typical Cases
 
 
 
Products
 

Using place
Xinwen Mining Group Dragon Energy Limited Longgu mine
Xinwen Mining Group in Inner Mongolia Energy Great Wall Mine
Xinwen Mining Group Huaheng mining companies
Kailuan (Group) Co., Ltd. Donghuantuo mine
Heilongjiang Long Coal Mine Group Hegang branch Jude coal
 
Roadway and geological conditions
 
■Full rock Roadway, rock hardness of f8 ~ f10, some parts can reach to f13
■Hard rock texture, closely arranged, no stratification
 
Roadway section and support form
 
■Xinwen Mining Group Dragon Energy Limited Longgu mine  section size(W×H)5.7m×4.95m
■ Xinwen Mining Group in Inner Mongolia Energy Great Wall Mine(W×H)5.2m×4.8m
■Xinwen Mining Group Huaheng mining companies section size 5.0m×4.8m
■Kailuan (Group) Co., Ltd. Donghuantuo mine   section size  W×H)4.8m×3.7m
■Heilongjiang Long Coal Mine Group Hegang branch Jude coal section size(W×H)5.0m×4.0m
■ support: bolting

Testimonials
 
■Longgu mine of Xinwen Mining Group Dragon Energy Limited has been using the EBH300 (A) cantilever road header so far, the best daily tunneling distance is 5.5 meters, the best month tunneling distance is 165 meters. The road header is always operated by remote controller, convenient and flexible; good hard - rock cutting ability, high efficiency, low consumption of pick; high loading efficiency, big power; high reliability of hydraulic and electrical components. It is superior performance, safety and reliability, and has reached the international advanced level, can meet all requirements of the rock tunneling, and can replace similar imported models.

■ The EBH300 (A) was put into use in Kailuan Group Donghuantuo mine in September 2011 and has been working so far, the first month of use created a new record of full rock tunnel boring. Roadway section is the semi-arched cross-section area of 20 square meters, daily cutting 9-9.6 m, the full month of 22 days, cutting distance reached 200.2 meters. The cutting stable, high efficiency, small cut picks consumption. Separate loading and delivering electric driving systems made it more adapted to rock roadway. It was equipped with imported advanced centralized lubrication system to ensure that all parts worked normally and reliably, at the same time, improve maintenance efficiency, reduce labor intensity.

 
 
Copyright:Shijiazhuang Coal Mining Machinery Co., Ltd. ICP:09037270
Design by:http://www.sjznet.net